BLOC SCADA Panel

Van, Texas

North Elevated Storage Tank

BLOC Design installed a new SCADA RTU panel at the EST. This panel monitors the level of the tank and controls a fill valve. A new antenna was installed on the elevated storage tank. All data is transmitted via radio to the South Elevated Storage Tank Master PLC. 

Water Plant Number 1 SCADA

BLOC Design removed the existing SCADA panel from the Penn Street Pump Station, modified and reprogrammed it to be used at Water Plant 1. This panel monitors the level of the (2) onsite ground storage tanks and hydro pneumatic tank, system pressure, and flow meter. This panel controls the well started, hydro pneumatic booster pumps and the (3) High Service Pumps. Operator adjustable set points were programmed on the touchscreen for hydro tank water level air pressure, GST high and low level, well on/off set points for all wells, as well as on/off set points for the high service pumps based on elevated storage tank levels. 

Water Plant 1 MCC

BLOC Design provided and installed a new, custom-built stainless-steel Motor Control Center (MCC) cabinet that replaced the existing MCC at Plant 1. This new MCC will have a single external disconnect for the 600 Amp main breaker inside the cabinet. The cabinet also includes a new overcurrent protection and motor starters for (1) 125 HP well motor, (3) 40 HP high service pumps, and (2) 7.5 HP hydro tank booster pumps. It includes (1) 30 Amp breaker for the Chlorine pump feed, and (1) 15 Amp breaker for the lighting transfer feed. This panel is connected to the new SCADA panel for controls.